Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13541561
- Product Categories
- Friendly Links
- home > Supply > Kazi is the first encyclopedia quote _ blessed well-known trademarks (certified) _ Zhoushan clip Daquan
Kazi is the first encyclopedia quote _ blessed well-known trademarks (certified) _ Zhoushan clip Daquan
Information Name: | Kazi is the first encyclopedia quote _ blessed well-known trademarks (certified) _ Zhoushan clip Daquan |
Published: | 2015-02-26 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Blessed is the first product [Recommended]: Material: Purpose: hydropower project is the first of its five stores were blessed adequate supply, customizable shaped clips, welcome new and old customers to negotiate. Although production of the metal material from the material has become a big country in the world, but from the quality level of production technology, quality and other aspects also, and there is a big gap between the advanced world level [blessed is the first to recommend the star product - Kazi] pipe card What is the essential difference between the pipe clamps? (B) 3, pipe clamps installer before soldering mounting plate assembly, in order to better determine the direction of the clip, it is recommended to do the marking clips Daquan manufacturers at a fixed place, after welding, welding, pipe clamp on the lower body inlay more than half of the money clip Encyclopedia, put the tube to be fixed. The other half pipe clamps put on the body and cover screws tightened. Avoid direct soldering has been installed floor pipe clamp. Mounted to the rail clamp Daquan price, based on the rails can be welded or fixed with screws, and then pushed inside the orbit of the rail nut and turn 90 degrees, the lower half of the body is embedded tube clamp nut, put the tube to be fixed , put on the half pipe clamp body and cover with screws. Daquan stacked clamp assembly, based on the rails can be welded or screwed, first install the upper and lower half of the tube clamp body, put the tube to be fixed on the half pipe clamps put on the body, with screws, by locking cover to prevent it from turning. Then install a second pipe clamps, as above. Bend the assembly, the assembly elbow, should be directly in front and rear elbow pipe clamp with Custer. Such a proposal should be fixed bearing point position. Therefore, the difference between the tube and the tube clamp card is no different, they use are the same, only the name of the product is not the same, some people call him the folder, and some called him Tube card. Kazi is the first encyclopedia quote _ blessed well-known trademarks (certified) _ Zhoushan clip Daquan Nankai District, Tianjin is the first by a wonderful building materials sales center. Nankai District, Tianjin is the first blessing of building materials sales center (www.tjnxdfqz.com) is Tianjin, metal building materials leader, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. Blessed is the first leader in the staff warmly welcome all inquiries to discuss, is the first to create a better future blessed. |
Admin>>>
You are the 45017 visitor
Copyright © GuangDong ICP No. 10089450, Nankai District, Tianjin is the first wonderful building materials sales center All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 45017 visitor
Copyright © GuangDong ICP No. 10089450, Nankai District, Tianjin is the first wonderful building materials sales center All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility